Author:
Viana Ana,Pinho de Sousa Jorge
Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference38 articles.
1. R. Alvarez-Valdes, J.M. Tamarit, Heuristic algorithms for resource constrained project scheduling: A review and an empirical analysis, in: Advances in Project Scheduling, Elsevier, Amsterdam, 1989, pp. 113–134
2. A new heuristic solution method in resource constrained project scheduling;Bell;Naval Research Logistics,1991
3. Scheduling projects to resource constraints: Classification and complexity;Blazewicz;Discrete Applied Mathematics,1983
4. Some efficient multiheuristic procedures for resource constrained project scheduling;Boctor;European Jornal of Operational Research,1990
5. Heuristics for scheduling projects with resource restrictions and several resource-duration modes;Boctor;International Journal Production Research,1993
Cited by
83 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献