Author:
Tang Lixin,Liu Jiyin,Rong Aiying,Yang Zihou
Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference17 articles.
1. A mixed integer programming model for scheduling order in a steel mill;Redwine;Journal of Optimization Theory and Applications,1974
2. Inter-process synchronization in steel production;Petersen;International Journal of Production Research,1992
3. A model for sequencing a continuous casting operation to minimize costs;Lally;Iron & Steelmaker,1987
4. X. Tong, J. Silverman, S. Clausen, A caster sequencing optimization program for Geneva Steel's Facility Modernization project, presented at Annual AISE Convention, September 1994
5. A scheduling model for LTV steel's Cleveland works' twin-strand continuous slab caster;Box;Interface,1988
Cited by
155 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献