1. Baker, K.R., 1997. Heuristic procedures for scheduling job families with setups and due dates. Naval Research Logistics (to appear)
2. Complexity of task sequencing with deadlines, set-up times and changeover costs;Bruno;SIAM Journal on Computing,1978
3. Batch scheduling to minimize maximum lateness;Ghosh;Operations Research Letters,1997
4. Hall, N.G., Posner, M.E., 1996. Generating experimental data for scheduling problems. Manuscript, Ohio State University, Columbus, OH
5. Single machine scheduling with batch set-up times to minimize maximum lateness;Hariri;Annals of Operations Research,1997