Author:
Sprecher Arno,Drexl Andreas
Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference20 articles.
1. A note on “Hierarchical models for multi-project planning and scheduling”;Hartmann;European Journal of Operational Research,1996
2. J.H. Patterson, R. Slowinski, F.B. Talbot, J. Weglarz, An algorithm for a general class of precedence and resource constrained scheduling problems, in: R. Slowinski, J. Weglarz (Eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 1989, pp. 3–28
3. Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems;Patterson;European Journal of Operational Research,1990
4. Hierarchical models for multi-project planning and scheduling;Speranza;European Journal of Operational Research,1993
5. A. Sprecher, Resource-constrained project scheduling: exact methods for the multi-mode case, Lecture Notes in Economics and Mathematical Systems, no. 409, 1994, Springer, Berlin
Cited by
171 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献