1. External prestressing in bridges. SP-120;Naaman,1990
2. New directions for Florida post-tensioned bridges. Final report for Florida post-tensioned bridges. Corven Engineering Inc., Florida; 2002.
3. Anchorage of external tendons in end diaphragms;Wollmann;ASCE J Bridge Eng,2000
4. Roberts CL, Breen JE, Kreger ME. Measurement based revisions for segmental bridge design and construction criteria. Res. Rep. 1234-3F, Ctr. for Transp. Res., Austin (TX): The University of Texas at Austin; 1993.
5. Toward a consistent design of structural concrete;Schlaich;PCI J,1987