1. Evaluation of overtopping riprap design relationships;Abt;J Am Water Resour Assoc,2013
2. Überströmbare Dämme – Beitrag zur Bemessung von Deckwerken aus Bruchsteinen/ Overtopping Dams-Design Criteria for Riprap;Dornack,2001
3. A fast all-in-one method for automated post-processing of PIV data;Garcia;Exp Fluids,2011
4. Bosch Sensortech GmbH. “BMC150 and 150”; 2019. URL: https://www.bosch-sensortec.com/bst/products/all_products/bmc150, https://www.bosch-sensortec.com/bst/products/all_products/bmc160, retrieved: 15/Oct/2019.
5. Smartstones: A small 9-axis sensor implanted in stones to track their movements;Gronz;Catena,2016