1. Offshore monopile failure – a solution may be in sight;de Vries;Wind Power Month Mag,2010
2. NoordzeeWind, Operations report 2009, Technical Report, NoordzeeWind; 2010. .
3. DNV, Joint industry project summary report from the JIP on the capacity of the grouted connections in offshore wind turbine structures, Technical Report 2010-1053, Det Norske Veritas AS; 2011a.
4. Design of grouted connections for monopile offshore structures;Lotsberg;Stahlbau,2012
5. Experimental testing of grouted connections for offshore substructures: a critical review;Dallyn;Structures,2015