Author:
Zhang Wen-ming,Zhang Zhe-hong,Wang Zhi-wei,Chen Bin
Reference36 articles.
1. Integral manufacturing and erection techniques for steel truss girder of main navigational channel bridge of Shanghai- suzhou-nantong changjiang river bridge;Li;Bridge Constr,2020
2. Joint values determination of wind and temperature actions on long-span bridges: Copula -based analysis using long-term meteorological data;Wang;Eng Struct,2020
3. Long-term strain behavior of in-service cable-stayed bridges under temperature variations;Bayraktar;J Civ Struct Health Monit,2022
4. Long-term structural health monitoring of the Cleddau bridge: evaluation of quasi-static temperature effects on bearing movements;Kromanis;Struct Infrastruct Eng,2016
5. Temperature-based measurement interpretation of the MX3D Bridge;Glashier;Eng Stuct,2024
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献