1. Design and implementation of cemented rockfill at the ballarat gold project. mine fill proceeding;Sainsbury;Int Symp. Min. with Backfill,2014
2. Improving cemented rockfill design in open stoping;Farsangi,1996
3. M. Kockler, Design of cemented rockfill spans for longhole stoping at the Rain Mine, University of Idaho, PhD thesis (2007).
4. Effects of blasting on the stability of paste fill stopes at Cannington Mine;Van Gool;James Cook University,2007
5. Cemented rock fill for extraction of high-grade crown pillars at crusader gold mine;Finn;Australasia Inst. Min. Metall. Publ. Ser.,2002