1. Auxiliary air pressure balance mode for EPB shield tunneling in water-rich gravelly sand strata: feasibility and soil conditioning;Wang;Case Stud. Constr. Mater.,2022
2. Investigations on transient support pressure transfer at the tunnel face during slurry shield drive part 1: case A - Tool cutting depth exceeds shallow slurry penetration depth;Zizka;Tunn. Undergr. Space Technol.,2021
3. Comparison of earth pressure balance and slurry tunnel boring machines used for tunnelling in chalk;Warren,2018
4. Back-fill grout experimental test for discharged soils reuse of the large-diameter size slurry shield tunnel;Zhou;KSCE J. Civ. Eng.,2017
5. Performance-based re-use of tunnel muck as granular material for subgrade and sub-base formation in road construction;Riviera;Tunn. Undergr. Space Technol.,2014