1. Design and construction of field-cast UHPC connections (No. FHWA-HRT-14-084; HRDI-40/10-14 (750) E). United States;Graybeal;Federal Highway Administration,2014
2. Ultra-High Performance Concrete (FHWA-HRT-11-038);Graybeal,2011
3. FHWA, Iowa optimize pi girder;Keierleber,2010
4. “The Ultra Girder: A Design Concept for a 300-foot Single Span;El-Helou;Prestressed Ultra-High Performance Concrete Bridge Girder”,2021
5. Valente, Rui Macário Gomes. "Design of a pre-stressed bridge deck with ultra-high performance concrete." 2017.