Author:
Liang Xu,Wang Jinfeng,Wang Yun,Xiang Huawei,Feng Qian,Xu Rongqiao
Funder
National Natural Science Foundation of China
Subject
General Materials Science,Building and Construction,Civil and Structural Engineering
Reference37 articles.
1. Accelerated bridge construction in Washington State: From research to practice;Khaleghi;PCI J.,2012
2. Seismic resistance of socket connection between footing and precast column;Haraldsson;J. Bridge Eng.,2013
3. Behaviour of grouted pipe splice under incremental tensile load;Ling;Constr. Build. Mater.,2012
4. Feasibility study of grouted splice connector under tensile load;Ling;Constr. Build. Mater.,2014
5. Q. Yu, J.Q. Sun, Z.Y. Xu, L.Z. Li, Z. Zhang, S.L. Yu, Mechanical analysis of grouted sleeve lapping connector, Appl. Sci. – BASEL. 9(22)(2019) 4867. https://doi.org/ 10.3390/app9224867.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献