1. 3D Project (2022) 3D overview. [Online]. 2022. Available from: https://3d-ccus.com/3d-overview/ [Accessed: 21 February 2022].
2. ALIGN (2019) ALIGN-CCUS project work package 2 transport. [Online]. 2019. Available from: https://www.alignccus.eu/ [Accessed: 26 November 2019].
3. Altera Infrastructure (2020) Stella Maris CCS - carbon capture and storage. [Online]. 2020. Available from: https://alterainfra.com/articles/stella-maris-ccs-carbon-capture-and-storage [Accessed: 13 October 2021].
4. Gas conditioning-the interface between CO2 capture and transport;Aspelund;Int. J. Greenh. Gas Control,2007
5. Ship transport of CO2: technical solutions and analysis of costs, energy utilization, exergy efficiency and CO2 emissions;Aspelund;Chem. Eng. Res. Des.,2006