1. Comparing measured and calculated forces of a manifold deployment in 940meters water depth;Roveri,2003
2. Installation of a production manifold in 2000ft water depth offshore Brazil;Roveri,1996
3. A new method for deploying subsea hardware in deep water;Stock,2002
4. Development of subsea facilities in the Roncador field;De Gam Lima,2008
5. Latest progress in deepwater installation technologies;Wang,2012