1. The shifting bottleneck procedure for job shop scheduling;Adams;Management Science,1988
2. Scheduling computer and manufacturing processes;Blazewicz,1996
3. Bulitco, V. (2000, January). Envisionment-based scheduling using timed interval PetriNetworks: Representation, inference, and learning, http://www-old.cs.uiuc.edu/Dienst/UI/2.0/Describe/ncstrl.unic_cs/UIUCDCS-R-2000-2124.
4. An algorithm for solving the job shop problem;Carlier;Management Science,1988
5. Modeling, simulation, and control of flexible manufacturing systems: A Petri net approach;Chu,1998