1. Assessment of mitigation measures against benzene breakthrough into subsurface concrete pipe;Alhomair;J. Pipeline Syst. Eng. Pract.,2021
2. Guidelines for the use of the semipermeable membrane device (SPMD) and the polar organic chemical integrative sampler (POCIS) in environmental monitoring studies;Alvarez;U.S. Geological Survey,2010
3. Limited Soil Sampling Report;Nash County Maintenance Depot Nashville, Nash County,,2013
4. Emergency Standard Guide for Risk-Based Corrective Action Applied at Petroleum Release Sites,1994