1. API, 1992. API recommended practice for design, analysis, and maintenance of moorings for floating production systems. 2FP1 (RP2FP1), American Petroleum Institute, Washington, DC.
2. Alzheimer, J.M., Anderson, W.E., Beeman, G.H., Dudder, G.B., Erickson, R. et al., 1981. Wire Rope Improvement Program—Final Report, prepared for the US Department of Energy under Contract DE-AC06-76RLO 1830, Battelle Pacific Northwest Laboratory, Richland, WA, September 1981.
3. BP, 1997. An example of anchor wire tension on Buchan Alpha in adverse weather. Private Communication with Dr. William Morris, BP Exploration Operating Company Limited, Middlesex, letter dated 05/06/97.
4. Evaluation of fibre rope properties for offshore mooring;Banfield;Ocean Engineering,1998
5. Comparison of discard criteria in the regulations of different countries;Beck,1989