Subject
Control and Systems Engineering,Software
Reference8 articles.
1. Dijkstra, E. W. (1989). The next forty years (personal note EWD 1051).
2. DIN 44 300. (1985). Informationsverarbeitung (no. 9.2.11). Berlin: Beuth Verlag.
3. Halang, W. A., & Stoyenko, A. D. (1991). Constructing predictable real time systems. Boston: Kluwer Academic Publishers.
4. Load adaptive dynamic scheduling of tasks with hard deadlines useful for industrial applications;Halang;Computing,1992
5. Henn, R. (1975). Deterministische Modelle für die Prozessorzuteilung in einer harten Realzeit-Umgebung. Ph.D. Thesis, Technical University of Munich.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Back to Scheduling Models;Scheduling for Parallel Processing;2009