Research on the Effects of Concrete Shrinkage and Creep during the Construction Stage of Continuous Rigid-Frame Bridge with Horizontal Bottom Slab Cables
-
Published:2023
Issue:10
Volume:12
Page:1238-1246
-
ISSN:2326-3458
-
Container-title:Hans Journal of Civil Engineering
-
language:
-
Short-container-title:HJCE
Publisher
Hans Publishers
Subject
General Engineering
Reference21 articles.
1. Estimation formula of finished bridge pre-camber in continuous rigid-frame bridges
2. 韦仕荣, 杨斌, 陈闯, 徐桂弘, 汪权明. 贵都高速大跨径连续刚构桥-石门坎大桥长期挠度监测分析[J]. 土木工程, 2018, 7(3): 367-374.
3. 唐文斌, 覃亮, 袁博, 陶勇. 预应力损失对水平底板索连续刚构桥施工阶段力学性能影响分析[J]. 土木工程, 2023, 12(4): 472-482.
4. Seismic Vulnerability Analysis of Multi-main-span High Pier Continuous Rigid-frame Bridge in Terms of Cloud Method
5. 郑婵. 不同收缩徐变模型下的刚构桥结构响应研究[J]. 黑龙江交通科技, 2022, 45(6): 79-81.