Leendertse Wim,de Groot Bert,Busscher Tim
Abstract
Current project management often emphasizes hedging through a strictly phased and funneled development of the project scope. However, an increasingly engaged project environment and rise in the complexity of societal challenges cause an emerging demand for more open and interactive ways of managing projects. This requires projects to adopt an integrated management approach that focuses on flexing, which emphasizes the ability of a project to adapt to and co-create with the environment. Overemphasizing flexing, however, may undermine the controlled nature of project management. Therefore, it is necessary to find a form of project management that is both open and interactive without losing control. On the basis of specific project contexts and characteristics, this chapter presents criteria and tools for balancing hedging and flexing for inclusive project management.
Reference36 articles.
1. Turner R, Müller R. On the nature of the project as a temporary organisation. International Journal of Project Management. 2003;21(7):1-8
2. PMI. A Guide to the Project Management Body of Knowledge and the Standard for Project Management. 7th ed. Project Management Institute: Pennsylvania, USA; 2021
3. Stacey R. Tools and Techniques of Leadership and Management. Meeting the Challenge of Complexity. Routledge: New York; 2012
4. Stacey R. Strategic Management and Organisational Dynamics. 7th ed. Prentice Hall: London; 2015
5. Turner R. Gower Handbook of Project Management. 5th ed. Routledge: London, UK; 2014