Stability of Crown Pillar during Transition from Open Pit to Underground Mining

Author:

Prasad Verma Chandrani,K. Soni Abhay

Abstract

Mineral deposits at shallow depth are on the verge of exhaustion and transiting to underground mining operations, for extraction of deposits at depth has now become inevitable. The depth of open pit mine is generally governed by the stripping ratio and lateral extent of lease. When open pit reaches its ultimate designed depth and the ore is still existing at greater depth transition is must and barrier pillar needs to be left in between both the workings. If underground mining is below an opencast mine then stability of barrier/crown pillar between open pit and underground mining becomes critical especially when non-caving method is to be followed. It has its own implications and maintaining safety of pit and slope along with underground workings becomes a real challenge. Ground monitoring in terms of induced stresses and displacement holds paramount importance. The most popular method in metal mining is Long Hole/Blast Hole Stoping Method in top down sequence. Earlier hydraulic fill was common and is now being slowly replaced by Paste fill. In this chapter a few challenges existing in Indian mining scenario is discussed along with review of methodologies for optimum design of crown pillar. Parameter influence is also explored for its stability.

Publisher

IntechOpen

Reference19 articles.

1. Hutchinson DJ. A review of crown pillar stability assessment and rehabilitation for mine closure planning. In: The Proceedings of 4 North American Rock Mechanics Symposium, Seattle, Washington, July 31 – Aug. 3, 2000. Rotterdam: A.A. Balkema; 2000. Paper No: ARMA-2000-0473. ISBN: 9058091554

2. Kumar H, Deb D, Chakravarty D. Design of crown pillar thickness using finite element method and multivariate regression analysis. International Journal of Mining Science and Technology. 2017;(6):955-964. DOI: 10.1016/j.ijmst.2017.06.017

3. Shiguo S, Weidong L, Yujuan Z. The safe thickness of top plate in the process of the underground excavation transferred to opencast excavation. In: Proceedings of International Symposium on Energy Science and Chemical Engineering (ISESCE 2015). China: Atlantis Press; 2015. pp. 124-129

4. Xu S, Suorineni FT, Li YH, Jin CY. Use of an artificial crown pillar in transition from open pit to underground mining. International Journal of Rock Mechanics and Mining Sciences. 2019;:118-131. DOI: 10.1016/j.ijrmms.2019.03.028

5. Carter TG. Design lessons from evaluation of old crown pillar failures. In: Proceedings of International Conference on Surface Crown Pillars for Active and Abandoned Metal Mines, Timmins, Canada. Ottawa, Canada: Energy, Mines, and Resources Canada; Canadian Govt. Pub. Center [Distributor]; 1989. pp. 177-187

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3