Abstract
This paper gives a summary of the temporary works and methods applied to enable the construction of bridges near third party assets. The temporary structures have a significant impact on the cost, construction method and construction safety of the supported permanent structures. In the literature, there are many examples of how the temporary works could fail catastrophically and could endanger public life if hazard identification, risk assessment and quality checks are not carried out by competent people or organisations. A brief literature survey of the construction techniques is outlined here. This paper looks at more recent failures and draws some more lessons with a re-emphasis on the use of industry established processes, guidelines for preventing catastrophic events. The paper also describes case histories, where mitigation measures are implemented in order to ensure safety by means of independent checks, monitoring and back analysis.
Reference33 articles.
1. Grant M, Pallet P. Temporary Works: Principles of Design and Construction. London, UK: ICE Publishing; 2012
2. Bridle R, Sims F. The effect of bridge failures on UK technical policy and practice. Proceedings of the Institution of Civil Engineers: Engineering History and Heritage. 2009;162(1):39-49
3. Smith D. Bridge failures. Proceedings of the Institution of Civil Engineers: Part. 1976;1(60):367-382
4. HSE (Health and Safety Executive). Final Report of the Advisory Committee on Falsework. The Bragg Report. London, UK: HMSO; 1976
5. BSI. BS 5975: 2008+A1:2011. Code of Practice for Falsework. London, UK: BSI Publication; 1982