Affiliation:
1. Universiti Teknologi Malaysia, Skudai, Johor Bahru, Malaysia
Abstract
This study describes an empirical investigation revealing the critical obstacles to the adoption of a uniform pricing mechanism for building services from the perspective of industry practitioners. A total of 157 questionnaires conducted on quantity surveyors (N=75), mechanical engineers (N=39) and electrical engineers (N=43) were collected and used for the study. T –test statistics was run to identify ten significant factors from a list of fourteen factors identified. Relative importance indices were computed for each factor from the perspectives of the practitioners so as to determine the most critical obstructive factors. The result shows that the five most important obstructive factors in order of significance are: (1) difficulty in the interpretation of the Standard Method of Measurement by design consultants (2) the late involvement of building services design consultants (3) quantity surveyors' insufficient skill in mechanical and electrical services technology (4) drawings of services are often not ready for billing at the tender stage and (5) the lack of a generally accepted Standard Method of Measurement for mechanical and electrical services.
Subject
Management Science and Operations Research,Organizational Behavior and Human Resource Management
Reference25 articles.
1. McCaffrey J. (2011) “What is an M&E QS,” Royal Institution of Chattered Surveyors Students Construction Journal, pp. 22–23, 2011.
2. Construction Cost Management
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献