Author:
Lee Tong-Nyong,Yoon Moohyun,Soo Kim Young,Kim Hogil
Abstract
A 2 GeV synchrotron light source project is in progress in Pohang, Korea. The light source is designed to provide high brightness radiation with continuous wavelengths down to 1 A (10-8 em) with its peak at 4�43 A(Le. 2�8 keY). The project, consisting of a full energy injector linear accelerator and a 2 GeV storage ring, was launched in 1988 and is scheduled to be completed by the end of 1994. In this article, we introduce the main features and status of the storage ring components and the installation procedure. Radiation characteristics and beamline status are also described.
Subject
General Physics and Astronomy
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献