Author:
Sales Mark,Altmann Malcolm,Buick Glen,Dowling Claire,Bourne John,Bennett Alexandra
Abstract
Oil production from Cooper/Eromanga started in 1978, peaked in the 1980s and began a steady decline. Oil production from the Western Flank commenced in 2002 and has steadily increased. In the year until July 2014, a total of 8.6 million BBL of oil was produced from 16 active fields along the Western Flank, bringing the cumulative total to 24 million BBL. Western Flank oil has underpinned a ten-fold growth in market capitalisation in four listed Australian companies: Beach Energy, Drillsearch Ltd, Senex Energy and Cooper Energy.
Two sandstone plays dominate the Western Flank petroleum geology: the Namur Sandstone low-relief structural play and the mid-Birkhead stratigraphic play. The use of 3D seismic has improved the definition of both plays, increased exploration success and optimised field appraisal and development drilling.
Success rates have improved despite most Namur structural closures being close to the resolution margin for depth conversions (less than 8 m). Seismic attribute mapping is being refined in the more difficult search for mid-Birkhead stratigraphic traps with recent exploration discoveries indicating improved success.
Reservoir properties in the Namur are excellent with multi-Darcy permeability, unlimited aquifer strength, low gas/oil ratio (GOR) and low residual oil saturation. This combination leads to an oil recovery factor greater than 75%. Initial free-flow production rates commonly exceed 6,000 BBL per a day.
The mid-Birkhead reservoir is also of high quality but the lack of a strong aquifer drive reduces primary recovery.
New and re-processed 3D seismic and water-flood projects are expected to drive further discoveries, reserve and production growth.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献