The influence of a new water infrastructure development on the relative abundance of two Australian freshwater turtle species

Author:

Clark Natalie J.ORCID,Mills Courtenay E.,Osborne Nicolette A.,Neil Kerry M.

Abstract

Development of water infrastructure benefits water security and agriculture but poses risks to habitat and aquatic fauna. Wyaralong Dam was constructed on Teviot Brook in 2010 to provide future urban water supplies for South East Queensland, Australia. Construction of the dam created a large impoundment area and environmental impact assessment predicted significant impacts upon resident freshwater turtle species and their habitats. Differences in habitat requirements, life-history characteristics and sensitivity to change between the Macquarie River turtle (Emydura macquarii macquarii) and the common saw-shelled turtle (Myuchelys latisternum) were expected to influence the impact of the dam on the spatial and temporal abundance of these species. The relative abundance of each species was monitored at sites located within, upstream and downstream of the impoundment across wet and dry seasons during the dam’s first five years of operation. The results of this monitoring program indicate that spatial and temporal variability in the relative abundance of E. macquarii macquarii and M. latisternum occurred during the study but not all expected impacts were realised. Contrary to expectation, the relative abundance of E. macquarii macquarii did not increase over time within, upstream or downstream of the dam. M. latisternum showed greater temporal variability at some sites; however, no clear relationship between relative abundance and operational years was observed during the monitoring program. Spatial variability in relative abundance between sites was dependent upon season, with trends generally consistent across both turtle species. Where differences between species were observed, these are suspected to have resulted from the influence of environmental conditions on species-specific movement behaviours. The monitoring program confirmed the use of the upper limits of the impoundment and the plunge pool below the dam wall by both turtle species but relative abundance within the main body of the impoundment remained low throughout monitoring. The results of the study allow for consideration of the suitability of predefined management measures and the development of recommendations for future monitoring programs prescribed for water infrastructure developments.

Publisher

CSIRO Publishing

Subject

Animal Science and Zoology,Ecology, Evolution, Behavior and Systematics

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3