1. Topçu, G., “Cost-related operations in the building production process: estimation, planning, control”, MS Thesis, İstanbul Technical University, İstanbul, 25-32, (1989).
2. Uğur, L.O., Kanıt, R., Erdal, H., Namlı, E., Erdal, H.İ., Baykan, U.N., Erdal, M., “Enhanced predictive models for construction costs: A case study of Turkish mass housing sector”, Computational Economics, 53(4): 3336-3344, (2019).
3. Polat, A.P., Çıracı, M., “A database model for pre-design-phase building cost estimate in Turkey”, İTÜ Journal/a, 4(2): 59-69, (2005).
4. Özmaden, M.Ş., Erdal, M., “Performance analysis of methods used in the cost estimation of residential buildings”, Konya Journal of Engineering Sciences, 8(4): 970-985, (2020).
5. Kanıt, R., Baykan, U.N., Erdal, M., “Investigation of the effects of constrained source conditions on the structure cost”, Journal of Polytechnic, 8(2): 209-221, (2005).