Fatigue Failure Analysis of Bottom Hole Assembly during the Drilling of H-E1 and H-Q1 Wells in the Hululais Geothermal Field

Author:

Eiden Erald,Akbar Rizki,Hamid Abdul,Rakhmanto Pri Agung,Omar Esaim Mustafa Abrahim

Abstract

<p><em>In drilling operations it is intended to be able to conduct drilling quickly without causing damage to the drilling equipment and be able to produce good quality wells. Failure on the drilling pipe or bottom hole assembly (BHA) ranks results from loading that exceeds the maximum strength limit of the material. In this study, the calculation of the load on the downhole motor, where in the depth of the drill 512 meters failure occurs in the form of broken downhole motor. Based on the analysis conducted, at a depth of 494 meters the value of the hookload has increased quite high at 131.8 klb, while the maximum allowable hookload value is 121 klb, this indicates an overpull of 10.8 klb and based on the calculation of the drag value, a drag is obtained 38.8 klb while the maximum drag value is 28 klb, the difference between the actual drag value and the maximum allowable drag value is 10.8 klb, so it can be concluded that the failure that occurs in BHA # 10 is due to a drag that exceeds the maximum limit of 10.8 klb.</em><em></em></p>

Publisher

Universitas Trisakti

Subject

Religious studies,Cultural Studies

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3