Simulation to asses a payment proposal for Black Start service in Colombia

Author:

Carvajal Quintero Sandra Ximena,Arango Aramburo Santiago

Abstract

This article presents a payment proposal for Black-Start Service (BSS), which consists of bilateral procurements between generators and the administrator of the National Interconnected System (SIN). The procurement of Black-Start’s MegaWatt (MW) depends on both the maximum demand and the stability of each operative area. This proposal is analyzed using System Dynamics (SD) in order to assess the impact on the behavior of the generators regarding the payment proposal. The simulation model has a time horizon of 20 years and includes the Contract Time (CT), the contract amount (AC), and the number of agents (NA). Model results show that the procurements duration is essential to ensure the necessary participation in each contract period.

Publisher

Universidad de Antioquia

Reference22 articles.

1. I. Dyner, C. J. Franco, S. Arango. El mercado mayorista de electricidad colombiano. Ed. Universidad Nacional de Colombia. Sede Medellín. Medellín. 2008. pp. 1-4.

2. S. Stoft. Power system economics: Designing markets for electricity. Ed. IEEE. Wiley Interscience. New York. 2002. pp. 245-350.

3. A. Expósito. Análisis y operación de sistemas de energía eléctrica. Ed. McGraw-Hill. Madrid. 2002. pp. 217-259.

4. M. M. Adibi. ”Power System Restoration: Methodologies & implementation strategies”. IEEE series on power engineering. 2000. pp. 96-103.

5. E. Hirst. ”Maximizing generator profits across energy and ancillary services markets”. The Electricity Journal. Vol. 2. 2000. pp. 62- 69.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3