Funder
Ministry of Education, Science and Technological Development of the Republic of Serbia
Publisher
Centre for Evaluation in Education and Science (CEON/CEES)
Reference14 articles.
1. Attari, K., Elyaakoubi, A., & Asselman, A. 2016. Performance analysis and investigation of a grid-connected photovoltaic installation in Morocco. Energy Reports, 2, pp. 261-266. doi:10.1016/j.egyr.2016.10.004;
2. Ayompe, L.M., Duffy, A., McCormack, S.J., & Conlon, M. 2011. Measured performance of a 1.72kW rooftop grid connected photovoltaic system in Ireland. Energy Conversion and Management, 52(2), pp. 816-825. doi:10.1016/j.enconman.2010.08.007;
3. Chioncel, C.P., & et al., 2010. Yield factors of a photovoltaic plant. Acta Technica Corviniensis - Bulletin of Engineering, . pp. 63-66.;
4. Eltawil, M.A., & Zhao, Z. 2010. Grid-connected photovoltaic power systems: Technical and potential problems: A review. Renewable and Sustainable Energy Reviews, 14(1), pp. 112-129. doi:10.1016/j.rser.2009.07.015;
5. Hamrouni, N., Jraidi, M., & Chérif, A. 2008. Solar radiation and ambient temperature effects on the performances of a PV pumping system. Revue des Energies Renouvelables, . 11 (1), pp. 95 - 106.;
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献