1. Whittle User Manual, 2014, Geovia, Dessault Systemes, available at [http://www.geovia.com/node/483/?W T.ac=%20Whittle%20Whitepaper%20 CTA].;
2. Kržanović D., Vušović N., Ljubojev M., Selection of the Optimum Push- backs in a Long-Term Planning Process of the Open Pit -A Condition for Maximization the Net Present Value: Case Study: The Open Pit Veliki Krivelj, Serbia, Mining Engi- neering, Mining and Metallurgy Institute Bor, 1-2/2018, pp. 37-44.;
3. Feasibility Study for Exploitation of Mineral Deposits "Kraku Bugaresku" and "Cerovo", Mining and Metallurgy Institute Bor, 2008;
4. J. Whittle, Open Pit Optimization, Surface Mining, 2nd Edition, Editor Bruce A. Kennedy, Society for Mining, Metallurgy, and Exploration, Inc, Littleton, Colorado, 1990, pp. 470-475;;
5. Kržanović D., Rajković R., Mikić M., The Effect of Open Pit Slope Design on Net Present Value for Long Term Planning, The 46th International October Conference on Mining and Metallurgy, Bor Lake, Serbia, 2014;;