1. AACE International. (2006). International Recommended Practice. 29(29R-03), 130-139. https://web.aacei.org/docs/defaultsource/toc/toc_29r-03.pdf;
2. AACE International. (2011). Recommended Practice No. RP 52: Prospective Time Impact Analysis. https://web.aacei.org/docs/defaultsource/toc/toc_52r-06.pdf;
3. AACE International. (2011). RP 29R-03: Forensic Schedule Analysis. https://www.pathlms.com/aace/courses/2928/docum ents/3813#:~:text=The%20purpose%20of%20the%2 0AACE,scheduling%20in%20forensic%20schedule %20analysis;
4. Abd El-Hamid, S. M., Farag, S., & Abdelalim, A. M. (2023). Construction Contracts' Pricing according to Contractual Provisions and Risk Allocation. International Journal of Civil and Structural Engineering Research, 11(1), 11-38. https://doi.org/10.5281/zenodo.7876040;
5. Abd El-Karim, M. S. B. A., Mosa El Nawawy, O. A., & Abdelalim, A. M. (2017). Identification and assessment of risk factors affecting construction projects. HBRC Journal, 13(2), 202-216. https://doi.org/10.1016/j.hbrcj.2015.05.001;