Author:
Slim Rabih,Houssin Rémy,Coulibaly Amadou,Hanifi Masih,Chibane Hicham
Abstract
We focus on improving the performance of production machines (timesaving, flexibility, cost-effectiveness, safety) from the early design phase. Lean integration during the design phases might be a more appropriate solution, but this could be a source of some contradictions related to the machine performance and the usage requirements. In this paper, we propose an approach, based on Lean and Inventive Design Methodology (IDM-TRIZ), to identify and resolve these contradictions due to the Lean integration and also to provide innovative technical solutions. The approach is illustrated by the integration of the functionalities of the ''Single Minute of Exchange of Dies'' (SMED) and the ''5S'' method from the early design phase. A case study about the ''3D printer clogged nozzle'' outlines the feasibility of the proposed approach.
Publisher
Centre for Evaluation in Education and Science (CEON/CEES)
Subject
Mechanical Engineering,Mechanics of Materials
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献