Managed Pressure Cementing in HPHT Utilizing Real Time Pressure Estimation and Control Software – A Case Study

Author:

Rostami S. Ameen1,Mirrajabi M.1,Stoian E.1,Babar K.1

Affiliation:

1. Weatherford

Abstract

Abstract MPD enables drillers to navigate through narrow drilling windows to reach designed target depths. After a hole section is drilled, pressure management is still required to pull drill strings out and run and cement liners. Conventional cementing programs and procedures may not be practical for a challenging hole section that has been drilled by MPD. Elaborate wellbore pressure management is required to ensure safe and efficient cementing operations. The same closed loop circulation system utilized for drilling is used to manage the wellbore pressure during cement operations. The technique of pressure management during liner cement jobs was utilized repeatedly by a major client in one of the most challenging HPHT campaigns in the North Sea. This paper provides an insight into the technique as well as information on the procedures, challenges and lessons learned pertinent to these operations. Various cases studies describing the setup, planning and execution of operations, simulation vs measured data will be compared. Drilling wells in complex environments with century-old technology is difficult at best and unsafe at worst. From drilling through narrow pore-pressure/fracture-pressure gradient windows to mitigating kicks and differential sticking, managed pressure drilling (MPD) succeeds when conventional techniques are likely to fail. MPD entails the use of specialized equipment to control wellbore pressure profiles more precisely than is possible with conventional drilling methods. MPD enables drillers to navigate through narrow drilling windows to reach designed target depths. After a hole section is drilled, pressure management is still required to pull drill strings out and run and cement liners. Conventional cementing programs and procedures may not be practical for a challenging hole section that has been drilled by MPD. Elaborate wellbore pressure management is required to ensure safe and efficient cementing operations. The same closed loop circulation system utilized for drilling is used to manage the wellbore pressure during cement operations. A case study describing the setup, planning and execution of operations, and simulation is presented in this paper.

Publisher

OTC

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Oil well casing cement flash setting problem causes and identification strategy based on cheese model;Journal of Petroleum Exploration and Production Technology;2020-04-28

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3