Abstract The plans for many of the upcoming deepwater projects involve the use of highpower Electrical Submersible Pump (ESP) Systems for Artificial Lift. However, the perception in the industry is that the average run-life currentlyachievable with such high power ESP Systems is much shorter than what would bedictated by robust project economics, given that intervention costs in theseapplications can be very high, in the US$50MM - 75MM range. Therefore, theconsensus among operators is that there is a need to try and improve thereliability of these systems. In response to this industry need, DeepStar® recently commissioned a gap studytowards identifying the barriers that may be preventing ESP Systems fromachieving the desired reliability as well as the additional R&D effort thatmay be required for the industry to close the existing gap. DeeepStar® providesa forum for deepwater technology development, while leveraging the financialand technical resources of the industry (http://www.deepstar.org/). This paper presents a summary of the results of this study, including:the Mean Time To Failure (MTTF) that people believe is currently achievable (i.e.with current technology);the biggest differences about these applications, which introduce additional uncertainty to the ability of the system to performreliably;the main sources of uncertainty regarding each of the major ESPSystem component's reliability; andthe tentative plan that was outlined aspart of the project, to address the gaps that were identified. The Gap Analysis was based on phone interviews conducted with recognizedindustry experts, on discussions that took place with members of a TechnicalCommittee (TC) that was put in place for the project, and on a broader industrysurvey conducted through the internet. The proposed go-forward plan consists oftwo follow-up projects: one focused on improved system design and operationalpractices, including system monitoring (or surveillance) and control; and onefocused on validating the design of key components of concern, for thespecifics of these applications, through laboratory testing. The proposednear-future R&D effort has the support of major operators, but still needsto be fine-tuned, with input from the industry, before the actual work canproceed with buy-in and financial support from all of the partiesinvolved. Introduction The Oil and Gas industry continues to move towards more challengingexploitation environments offshore: deeper water (over 10,000 ft), longertie-backs, deeper reservoirs (up to 20,000 ft below the mud line), and/or withhigher viscosity oil. The plans for many of the major projects currentlyunderway in such offshore environments involve the use of relatively high powerElectrical Submersible Pump (ESP) Systems for Artificial Lift. These include, for instance: Shell's " Parque das Conchas" and Petrobras' " Parque das Baleias" in Brazil's Campos Basin, as well as Shell's Perdido, Petrobras' Cascade andChinook, and a few other projects in deep waters in the US' Gulf of Mexico(GOM) such as Chevron's Big Foot. Operating in these extreme environments will likely require deploying newproduction systems (e.g. with subsea boosting) and/or new generations of ESPequipment. While individual well production rates can exceed 20,000 bpd of oil, understanding of well performance is usually only marginal at the time ofsystem design and installation. Intervention costs in these scenarios can bevery high, sometimes in the US$50MM - 75MM range (per intervention). Productionlosses following an equipment failure can also be quite significant, especiallyfor wells with higher production rates. Therefore, the economic success ofthese projects is closely linked to the ability to minimize the number ofinterventions for equipment repair and maximize production uptime. Thisrequires not only using highly inherently reliable equipment but also havingthe best possible design and operational practices in place, in order to beable to actually realize the whole reliability potential of the equipment. Astated goal by some operators is to have 95% confidence that a 5 year run-lifecan be obtained from the ESP System, despite this very challenging operatingenvironment.

Publisher

OTC

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3