Step Change in CTD Strategy of Multilateral Drilling Using Under-Balanced Coiled Tubing Drilling UBCTD Technique in an Onshore Sour Gas Field-UAE -Case Study

Author:

Osama Mohamed1,Sumaida Ali Sulaiman Bin1,Shamlan Abdulla Bin1,Shahat Ayman El1,Mutawa Ahmed Al1,Almazrouei Saeed1,Saleh Abdalla1,Yousfi Fawad Zain1,Almteiri Nama Ali1,Baslaib Mohamed1,Deshmukh Rohit V.1,Solaiman Tarek1,Abdulsallam Fouad1,Mantilla Alfonso2,Ladmia Abdelhak2

Affiliation:

1. ADNOC Onshore, Abu Dhabi, UAE

2. ADNOC HQ, Abu Dhabi, UAE

Abstract

Abstract The Oil and gas industry needs to adapt its business models to meet the growing energy demands and to use our resources efficiently and responsibly for the benefit of humanity worldwide. The United Arab Emirates aims to produce enough gas to meet its own needs by 2030. To do this, the country has started several projects to explore and assess potential gas sources. This study focuses on one of these projects, which involves drilling three wells in an onshore field using a coiled tubing (CT) underbalanced drilling (UBD) technique to access gas from tight reservoirs. The Under Balanced Coiled Tubing Drilling (UBCTD) technology has a globally proven record of enhancing the production rate compared with conventional overbalanced techniques. The lateral length is limited due to buckling and lock-up of the coiled-tubing string, hence the multilateral drilling can overcome this limit and increase the well drainage compared to long horizontal sections. Implementing Coiled Tubing Drilling (CTD) with Multi-Lateral overcomes CTD limitation need for a single extended reach horizontal hole as conventional drilling, due CT lower Buckling limit, thus shorter lockup depth and reach in comparison with Conventional Horizontal Section. Detailed planning was carried out for the technology implementation and there were many challenges in the operations, nevertheless, this is the first project of it is kind for the operator company The lessons gained from daily challenging operations are considered the steppingstones for the technology implementation in Abu Dhabi. Comprehensive planning and simulations were done to overcome the challenge of different reservoir pressures, wellbore instability, and the absence of side-track operations history with CTD. The technique for multilateral drilling is characterized according to definitions established in 1997 during the Technology Advancement of Multilaterals (TAML) Forum held in Aberdeen. These standards classify junctions as TAML Level 1, 2, 3, 4, 5, or 6 based on mechanical complexity, connectivity, and hydraulic isolation. In UBCTD wells, the most common multilateral technology is with TAML level 1, which is done by open-hole sidetracks with barefoot completion. CTD drilling in multiple directions was effective, and one well finished with UBCTD had gas production rates about two to three times higher than conventional wells. The UBCTD pilot was very fruitful in all viewpoints contrasted with the pre-set achievement factors as coordinated by the practicality concentrated on that characterizes the accompanying achievement measures Adhere to Healthy Safety and Environmental Considerations. Drill 4000 ft using CTD.Drill the well laterals completely underbalanced.Achieve a 1.6-2 times production increase compared to Conventional Well Gas Production. This paper will highlight the project difficulties and lessons learned from coiled tubing drilling (CTD) in all the wells that were drilled and focus on a multi-lateral strategy to achieve the project goals.

Publisher

OTC

Reference7 articles.

1. Underbalance Coiled Tubing Drilling in Tight Gas Reservoir Study Case Onshore Field, Abu Dhabi;Ladmia,2020

2. Novel Engineering Approach Utilizing Underbalanced Coil Tubing Drilling Solutions for Tight Sour Gas Carbonate;Osama,2022

3. Lessons Learnt from First Time Coiled Tubing Underbalanced Drilling Implementation in Adnoc Group of Companies;Meguid,2022

4. Planning And Execution Of First Underbalanced Coiled Tubing Drilling;Osama

5. Case Study of Multilaterals Drilling in Under-Balanced Coiled Tubing Drilling(UBCTD) Implementation and Challenges for the First Time in Operator Group of Companies;Osama

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Revolutionary Pre-Set Well Design: Removing an Entire Section, Speeding Up Well Delivery by Six Days;SPE/IADC Asia Pacific Drilling Technology Conference and Exhibition;2024-08-06

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3