Horizontal Wells in a Steamdrive in the Midway Sunset Field

Author:

Carpenter D.E.1,Dazet S.C.2

Affiliation:

1. Shell Development Co.

2. Shell Western E&P Inc.

Abstract

SUMMARY Three horizontal wells have been drilled in a low pressure, mature steam drive at the D&E Unit of the Midway Sunset Field, Kern County, California. Simulation studies indicate that horizontal wells in thermal projects can increase recovery efficiency due to better a real sweep, accelerate production which improves the oil-steam ratio (OSR), shorten project life, and increase project profitability. The D&E Unit was selected as a test site for horizontal wells because gravel packs were not required for sand control. Low reservoir pressures and moderately sorted, sub-rounded sands contribute to the success of slotted liner completions. The reservoir is composed of well sorted, thick turbidite sands which dip at about 45°. The first two wells were drilled at an oblique angle to dip with approximately 400' laterals. The third well was drilled on strike with slightly more than a 700' lateral. Radius of curvature is approximately 40'. The three wells were drilled as short radius horizontal wells due to well and lease spacing constraints. The short radius design allows the rod pump to be placed in the vertical section of the hde with minimal draw down sacrifice. The lowest point of the laterals is 10' above the oil-water contact. All wells are completed with dotted liners. The three horizontal wells cost 2-3 times more than vertical wells. Oil production rates increased 2-3 times more than vertical wells in the two wells with 400' laterals. The third well with a 700' lateral is more prolific with 6 times the production rate of a vertical well. At this time, the wells are too immature to accurately predict ultimate recovery. This paper will discuss the drilling and completion design of the wells, steam soak data, temperature logs in the horizontal section and current production results. EXPECTED BENEFITS Simulation work has shown that horizontal wells in thermal drives accelerate production and increase recovery efficiency by improving a real sweep1,3,4,5 Increased production rates are a result of longer completed intervals and the additional draw down derived from placing the wells at the base of pay. In 1986, Huang, et al1 indicated that project improvement derived from horizontal well development could be dramatic; simulation results predicted a 250 percent increase in initial production rate. The best ease in the simulation reduced project life from 15 to 7 years. Other potential benefits include producing reserves between the oil-water contact and existing completions. Many existing wells were completed shallow to avoid penetrating the transition zone. Horizontal wells may be the most effective way to exploit this wedge of undeveloped reserves. Vertical wells frequently suffer from production problems Stemming from steam entry into the wellbore. Steam entry may cause sanding, liner damage, and high casing pressures. Horizontal wells would not "steam out" until the steam drive is very mature, therefore remedial work maybe significantly reduced.

Publisher

OTC

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3