Efficient and Safe Casing Removal with Downhole Hydraulic Pulling Assembly

Author:

Hartman C. J.1,Cullum J. L.1,Melder J. E.1

Affiliation:

1. Baker Hughes

Abstract

When performing a slot recovery or a well abandonment, the casing can frequently be difficult to pull. This could be due to scale, barite buildup, or cement stringers. Other considerations are the limitations of the rig and its ability to apply the force needed to pull a long string of casing. Removing stuck or lengthy sections of casing typically requires multiple cut-and-pull attempts as well as high-capacity rigs capable of pulling high loads, resulting in increased costs and potentially nonproductive time (NPT) and associated HSE risks. An alternate method that uses a downhole hydraulic pulling assembly enables operations to overcome these limitations and increase efficiencies. The hydraulic-activated assembly uses a pressure differential to anchor into the casing above the section to be removed while pulling as much as 1.8 million pounds through a casing spear that is engaged in the cut section. The pulling force is focused between two downhole anchor points, isolating the high loads from the derrick. This isolation protects the derrick and drillstring from upward drill pipe movement if the casing releases abruptly. Recent operations have proven the successful retrieval of casing in multiple offshore applications. When attempting to pull 9⅝-in. casing, the rig was limited to 570,000 pounds over-pull, which was insufficient to retrieve the stuck casing string. The hydraulic pulling assembly was set in the 13⅜-in. parent casing and pulled the casing free with 1.2 million pounds of over-pull. The operation was completed in one run, eliminating multiple cut-and-pull attempts. The time saved reduced operational expenses by USD 450,000. The system has also been used to pull 13⅜-in. casing from inside 18⅝-in. casing, and has been used on fixed and floating platforms. Deploying the hydraulic pulling assembly in cut-and-pull operations provides customers the ability to use lower-capacity rigs in plug-and-abandonment (P&A) operations and to safely pull loads up to 1.8 million pounds because the forces are confined downhole. Using specialized equipment to ensure successful cut-and-pull attempts enables safer jobs and provides a more cost-effective abandonment operation.

Publisher

OTC

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Tools and Techniques for Plug and Abandonment;Introduction to Permanent Plug and Abandonment of Wells;2020

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3