Challenges for Waterflooding in a Deepwater Environment

Author:

Alkindi Azhar1,Wright Robert Prince2,Moore Wesley1,Walsh John1,Morgenthaler Lee1,Kuijvenhoven Cor1

Affiliation:

1. Shell

2. RiskBytes

Abstract

Abstract Big reservoirs in deepwater Gulf of Mexico typically produce at world-class rates. The scale of investment is likewise world-class. The energy industry's drive to invest in enhanced oil recovery from deep-water basins is sustainable in a world of volatile oil prices and increasing demand for energy. However, project economics will continue to depend on accurate risk assessment, risk mitigation strategies, and more fundamentally, progressive deployment of evolving technologies in ‘brownfield’ deepwater secondary recovery projects. Details of well geometry and design optimizations may prove to be minor sensitivities in high cost deepwater developments, however rig rate has a major impact on economics. The assessment required to minimize the number of injectors and ensure their proper placement logically takes more time than exotic choices of injection patterns. With such major constraints in mind, an optimal design for wells and materials has to take precedence. Accepting this as a given, additional, more common, challenges would then follow. The waterflood study team for the deepwater Ursa- Princess field, in the Gulf of Mexico, has spent appreciable time and effort evaluating various potential challenges affecting the surface and subsurface aspects of the development plan. The design for an optimum injection rate was a bottom-up process starting from the reservoir up to the topsides injection facilities. Reservoir sweep efficiency and reservoir pressure distribution logically dictated injection well designs and injection pump sizing. Subsurface risks, such as reservoir souring and hydrate formation, dictated materials selection and completions design. This paper addresses the challenges primarily affecting the design of the deepwater subsea injection wells. In addition to the well cost, several other underlying factors have played an influential role in defining the boundary conditions for the injectors design. Background Industry-wide experience in the execution and the operation of waterflood projects in deepwater environments relatively limited. With a relatively few analogues, the Ursa and the Princess fields are set to embark on major facilities expansion and subsea development. The aim is to deliver high rate of specific quality water though four subsea injection wells into a vast and, largely thirsty, reservoir. Ursa and Princess reside 100mi SSE of the Mississippi River mouth in the Mars Basin, Gulf of Mexico (GOM). The Ursa field was discovered in 1990 and has been on production since 1999. The Princess field was discovered in 2000 and has been producing since December 2003 through a subsea tieback to Ursa. The fields have their main reservoirs common and are in pressure communication. The working interest in the Ursa and Princess fields are Shell (45.4% operator), BP (22.7%), ExxonMobil (16%), and ConocoPhillips (16%). The Yellow reservoir is the main reservoir at both Ursa/Princess and Mars, the other major field in the Mars basin. It is a world class Upper Miocene turbidite reservoir that stretches across the Mars Basin, including the Mars Field. This 12,000-acre reservoir is charged with light oil type, though with slight variations in properties as indicated by the analysis results of the abundant PVT samples.

Publisher

OTC

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Chapter 7 Production Chemistry;Developments in Petroleum Science;2009

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3