Affiliation:
1. AMOG Consulting
2. Chevron ETC
3. ConocoPhillips
4. DeepStar®, Chevron ETC.
Abstract
Abstract
The results of an industry survey of mooring line failures are presented and analyzed. The failure data presented includes geographic location, mooring line composition, prevalent failure modes and the phase of failure inception. At a component level, cause of failure, location along the line and time to failure are presented. Failure data suggests that the observed increase in the number of failures is proportional to the increase of the FPSO population, with the underlying failure rate per mooring line approximately constant over the last ten years.
Cited by
18 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献