Case Histories of Improved Horizontal Well Cleanup and Sweep Efficiency With Nozzle Based Inflow Control Devices (ICD) in Sandstone and Carbonate Reservoirs

Author:

Raffn Anne Gerd1,Zeybek Murat1,Moen Terje2,Lauritzen Jon Eric3,Sunbul Ahmed Hassan4,Hembling Drew E.4,Majdpour Abdi4

Affiliation:

1. Schlumberger

2. Reslink AS

3. Reslink Inc.

4. Saudi Aramco

Abstract

Abstract This paper discusses the PLT-correlated results of two test wells completed during 2006; one in sandstone and one in a carbonate reservoir, with the new completion technology of nozzle-based passive inflow control devices (ICD) which improves performance of wells with reservoir challenges as described:In highly productive sandstone reservoirs, horizontal wells suffer from uneven flow profile and subsequent premature cresting/coning effects. In general, there is a tendency to produce more at the heel than at the toe of horizontal wells, which contributes to poor well cleanup at the toe. Additionally, excessively increasing the rate and/or horizontal well length can increase the risk of limiting sweep efficiency, resulting in bypassed reserves1.In carbonate reservoirs, permeability variations and fractures can cause uneven inflow profile and accelerate water and gas breakthroughs. Wells with early gas or water breakthrough have to be shut-in until remedial plans are decided and implemented, resulting in deferred production. The main reservoir objectives for applying passive ICD technology in the two test wells are:Sandstone: Decrease the influence of heel-toe effects and high permeability zones; hereby deferring water/gas breakthrough, improving well cleanup and sweep efficiency.Carbonate: Control flow rates from high permeability intervals and to limit production from each compartment based on lateral offset from the gas-oil contact to prevent premature gas breakthrough. The test well PLT-logs were correlated to static reservoir simulations. Analyses of the well performances show that the objectives of both completions were achieved. By having proper matches of the completions with ICD, the value over standard completions can be evaluated. Post-evaluation of the completion designs based on the PLT-log results has increased our understanding of the nozzle-based ICD performance. As a result several approaches for completing wells in both sandstone and carbonate reservoirs with ICD have been recommended in order to achieve optimized inflow performance. Introduction Two trial wells with nozzle-based passive ICD systems were designed and completed in 2006; one for sandstone and one for carbonate reservoirs. To evaluate and approve the new ICD completion, these wells were production logged and the results were carefully analyzed. The most important feature of the ICD completion is the self-adjusting effect of flow variations anywhere along the well trajectory and whenever they occur during entire well life. The key benefits are:Increased well life and reserves due to improved sweep efficiency.Delayed gas and water breakthrough.Decreased water/gas rates after breakthrough when water/gas mobility is higher than oil.Improved well cleanup.

Publisher

OTC

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3