A Novel Hydraulics Design Approach Enables Simplified Configuration Offshore Wells

Author:

Sansoni Umberto1,Waldmann Alex Tadeu De Almeida1,Menezes Gabriela Marcia Ribeiro1,Gonzaga Kaio1,Suchodolak Daniel1,Martins André Leibsohn1

Affiliation:

1. PETROBRAS

Abstract

Abstract The reduction of the number of sections in the construction of an offshore well is a major driver for cost reduction. In order to achieve this goal, the sections must be longer, resulting in additional challenges. A critical aspect is related to the second section (no fluid return to surface) reaching high inclinations and longer extensions. Such sections are drilled with fluids with no carrying capacity, reaching 1500 m and inclinations as high as 65 degrees, resulting in expressive cuttings accumulation in the wellbore annulus. The scope of this article is to present a novel hydraulics design procedure which accounts for the effect of hole cleaning actions during well construction which reposition hydraulic parameters into acceptable criteria. This paper details novel design procedures which include the following steps: Defining cuttings bed height deposited along the wellbore annulus using traditional steady state cuttings transport models. This information is the initial condition for the design of hole cleaning pills pumping. Estimation of the extension of the cuttings bed through a material balance. Estimation of drag efforts for drillstring movement in the presence of a cuttings bed and the maximum well length which can be handled by the rig without carrying extra hole cleaning procedures. Calculation of the solids removal due to the pumping of hole cleaning pills based on a transient solid-liquid model. Optimization of the frequency, volumes and pump rates for the cleaning pills. This way, the proposed methodology allows the creation of a hydraulics design package which incorporates the optimization of hole cleaning actions during the drilling of a deviated well with fluids which do not present cuttings carrying capacity. The procedure was successfully implemented in 4 offshore wells in Campos basin, offshore Brazil, which were built in only 3 sections including a horizontal section. The present methodology is a milestone in hydraulics design for offshore wells, enabling the construction of horizontal wells in 3 phases resulting in a huge well construction time reduction.

Publisher

OTC

Reference14 articles.

1. Drag induced lift in granular media;Ding;Phys Rev Lett.,2011

2. An Improved Method for Calculating Swab and Surge Pressures and Circulating Pressures in a Drilling Well;Fontenot;SPE Drilling Engineering,1974

3. Gavignet, A. A., Sobey, I. J. A Model for the Transport of Cuttings in Highly Deviated Wells. SPE Annual Technical Conference. New Orleans, LA, EUA1986.

4. Iyoho, A.W. Drilled-cuttings transport by non-Newtonian drilling fluids through inclined, eccentric annuli. Ph.D. thesis, University of Tulsa, OK, EUA, 1980.

5. A Computer Model for Hole-Cleaning Analysis;Iyoho;Journal of Petroleum Technology,1988

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3