Jolliet TLWP Well Systems

Author:

Myers R.J.1,Delgado J.H.2

Affiliation:

1. Conoco UK Ltd.

2. Conoco Inc.

Abstract

Abstract This paper cut lines the unique features of the Jolliet Project well Systems. same of these features are as a result of experience gained on the Hutton tension leg platform, while others came as a result of special condition relative to the Jolliet Project. The paper describes the systems starting at the drilling template, moves up the production riser to the surface support facilities and finishes with the internal completion. INTRODUCTION The well systems on the Jolliet Project Tension leg well Platform (TLWP) comprise the components of the production riser system. Full size tension leg platforms may have tensioned production, export and drilling risers. In the case of the Jolliet Project, all wells were predrilled and work over?s will take place through a 9-5/8 inch casing. Cot1segUently, there is no need for a drilling riser as no new drilling, apart from sidetracks cut of a cased hole, is anticipated. The export risers are flexible pipeline risers to minimize weight am tie-ins on the TLWP. The production riser system (Figure 1) consists of the sub sea wellhead which sits in the drilling template receptacle, lower riser connector, tapered joint, riser pipe, special top riser joint, wellhead, Christmas tree and tensioned. sitting inside the production riser is the internal tubing completion. WELL SYSTEM Components Long Wellhead Receptacles (Figure 2) one of the requirements of a TLP production riser system is to install the 30 inch wellhead vertically, as this in turn sets the verticality of the 18-3/4 inch high pressure housing. Anyl deviation from vertical in the high pressure housing has a detrimental effect on the fatigue life of the production riser. The long wellhead receptacle (15 feet) has reduced diameters at the top and at the bottom that restricts the 30 inch casing angle to I' when it is being run am the 30 inch wellhead housing to 0.5' when installed. This system may be used with jetted or dynadrilled casing. The receptacles form part of the well pods installed on the drilling template [1]. Because they do not serve as structural members, the receptacles were lightened with large, cut windows to reduce the in-place and lift weight of the well pods. Guide Posts (Figure 3) There are no permanent guideposts installed on the drilling template. The posts are removable and are installed each time a riser is run or drilling takes place. '1bey latch by means of their own weight into a receptacle and are released by a hydraulic tool that can be run on a FDV or on drill pipe from the surface.

Publisher

OTC

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Design and analysis of tapered stress joint for Top Tensioned Riser system;China Ocean Engineering;2012-08-30

2. Preliminary design of composite riser stress joints;Composites Part A: Applied Science and Manufacturing;2001-05

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3