Deepwater Bop Control Systems - A Look At Reliability Issues

Author:

Shanks Earl1,Dykes Andrew2,Quilici Marc2,Pruitt John2

Affiliation:

1. Transocean

2. ABS Consulting

Abstract

Abstract Historically, drilling contractors have accepted without many questions the reliability of the Blowout Preventer (BOP) components and overall control system. A statistical reliability approach to qualifying, purchasing, and maintaining deepwater BOP control systems should provide a high level of confidence of being able to have long periods of time between planned maintenance of these systems with very few, if any, failures. A study of deepwater BOP control systems has been performed to look at reliability issues and a means to qualify systems and components for a determined period between maintenance. Of special attention are the regulators and how they are typically arranged and used in the system. This paper will describe a statistical process to determine the reliability and failure rate necessary to accomplish the maintenance goal. In addition, the qualification process will be described and a discussion of the pressure control regulator issues discovered in the study will be provided. Introduction Transocean, like many other offshore drilling contractors, recently went through an extensive rig newbuild and upgrade program, which required purchasing a significant amount of customer-furnished equipment for the various shipyards. As with most "boom" cycles, the industry activity before the building cycle had developed ideas for new rig technology, but lacked R&D resources to make them available to be manufactured as already proven systems. Therefore, this building cycle, similar to all the rest, resulted in R&D efforts in parallel with the manufacturing of new equipment to be installed on new rigs. And, as before, this resulted in design and related problems while in service that drove significant downtime, in many instances. At times, it appears the industry attitude is that we cannot afford R&D in advance of a defined need. However, the industry seems to be able to afford to fix the problems associated with downtime due to an incomplete design. Many of these problems are directly related to not having a detailed set of design and functional specifications to give to the equipment manufacturer. Plus, the purchaser usually does not understand the duty cycle requirements, or demands, of the particular equipment for an interval that is acceptable to perform maintenance on the equipment without sustaining downtime. For offshore floating drilling operations, especially in deepwater, one of the most expensive downtime events is associated with having to pull the marine riser and subsea BOP because of a problem. Any problem or failure that requires the riser and BOP to be round tripped will result in a cost of approximately ﹩1.00 MM per event. And whether the contractor or the operator absorbs this cost, it is expensive. One of the more common causes for pulling the marine riser and subsea BOP is associated with the BOP control system. The deepwater BOP control system associated with dynamically positioned (DP) rigs is typically a Multiplexed Electro- Hydraulic (MUX) Control System. This is schematically shown in Figure 1. The demand on the subsea control system is initiated at the surface. The demand signal is multiplexed down the control umbilical to the subsea control system. There, the signal is decoded, confirmed, and performed.

Publisher

OTC

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3