Abstract While pre salt carbonate reservoirs are the main source of hydrocarbon production in Brazil (Jardim et. Al 2020), offshore mature fields located on post salt and sandstone reservoirs are still relevant. Cost effective solutions and treatment optimization are required to maximize return on investment. This paper introduces a new method to perform these jobs economically and efficiently. An overview of the operations performed on Brazilian mature fields and contingency operations for pre-salt carbonate wells including methods, strategies and benefits are reviewed. A compacted and versatile on-the-fly stimulation plant is deployed to perform acid stimulation jobs for sandstone and carbonate offshore formations. The use of this system provides the flexibility to mix several types of acidizing fluids in reduced areas, for both carbonates and sandstones, providing similar capabilities than a costly stimulation vessel, or an offshore rig with limited deck area. Concentrations of the stimulation chemicals are modified in real time, using various systems without stopping the pumping operation. This compact on-the-fly stimulation method shows many benefits, saving rig time, allowing the pumping of several chemicals, and making feasible operations that were possible only with stimulation vessel due to limited deck space of the rig. In some scenarios, large acid volumes are pumped without the need of additional acid tanks with pre-mixed acid solutions. Higher pumping rates are attained, leading to large zonal coverage treatments and rig time savings. This method has been used very successfully in Brazil since 2018 using several acidizing systems, including HCl, Mud Acid, polymeric diversion system and other acid-based technologies. Over eleven wells were treated using this on-the-fly stimulation method. Such operations take a maximum of 15 days from mobilization until demobilization. Assembly skid mounted vessels can take double or triple of the time and can increase the costs three times, which can make some projects unfeasible. This solution is switchable for low-cost projects on mature wells and workovers. The novelty is the introduction of a compact on-the-fly stimulation plant that provides with more efficient and cost-effective acid stimulation and pumping treatment allowing real-time acid concentration modification and the capability to use various acidizing technologies.

Publisher

OTC

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3