Affiliation:
1. PETRONAS Carigali Sdn Bhd
2. Halliburton Energy Services
Abstract
Abstract
This paper presents a case history in which a single-trip multizone sand control system was successfully deployed in Malaysia using a hydraulic workover (HWO) unit. The well consists of two (2) zones which were both treated and completed in a single-trip gravel pack system. This paper discusses in detail the design selection and operation, which includes the challenges faced and mitigation to overcome the challenges. All operations involved were completed with a significant time and operational cost saving to the operator.
This was the first successful single-trip multizone installation using HWO globally. The sustained prolific oil production from this well affirms the success of the completion and gravel pack treatment method. These positive results highlight the importance of operator technical/operations personnel and service providers working as a team to develop the most appropriate solutions to the technical and operational challenges encountered.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献