Case Study: Utilizing of Inflow Control Device To Control Oil Wells from Water Production and Regulate Waterfront Encroachment

Author:

Bajunaid Hani Ahmed1,Moawad Taha Mousrafa1,Al-dhafeeri Abdullah M1,Abd Elfattah Mahmoud Mohamed2,Mohammed Tawakol I.1

Affiliation:

1. Al-Khafji Joint Operations

2. Schlumberger

Abstract

Abstract Khafji offshore field, located in the Arabian Gulf, contains an unconsolidated sand reservoir subdivided into two, upper and lower reservoirs. Upper sandstone reservoir has relatively low reservoir pressure utilizing gas lift to help wells achieve production target rate. The main obstacle in upper reservoir is water encroachment due to unfavorably high-water mobility compared to oil; which presents a reservoir management challenge in the form of curbing water production linked to relatively high-permeability sandstone reservoir. In upper reservoir, water encroachment is dominated by active edge-water drive and it has irregular water-front movement because of the presence of high permeability streaks. Excessive water production from the high permeability upper sandstone reservoirs causes major economic, operational, and environmental problems during oilfield operations. Water production can also cause secondary problems such as sand production, corrosion, emulsion, and scale formation. Although the reservoir has been on production more than 50 years, water sources are still considered to be a mystery. Many different concepts and scenarios have been considered such as channeling behind the casing, highly conductive faults, channeling through the high-permeability zones and high-permeability streaks, which accelerated water production. As a result of this issue, water breakthrough at crested wells in an edge-water driven upper reservoir and water production has increased. Inflow Control Devices (ICD) completion has been installed in upper reservoir wells to overcome water production challenges. Low reservoir pressure is a major challenge for upper reservoir wells ICD completion design. During the course of this paper, Khafji field water encroachment study results have been discussed to show the latest water front movement expected scenario. In addition, ICD-completed wells performance was analyzed and compared to cemented perforated liner completion wells (Non-ICD completion) offset wells in upper reservoir. The parameters that were used during the ICD-completion design to overcome the main field challenges were highlighted. ICD completed wells showed positive performance results in water production control and higher oil production rate.

Publisher

OTC

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3