Prevention of Severe Slugging in the Dunbar 16' Multiphase Pipeline

Author:

Courbot A.1

Affiliation:

1. Total

Abstract

Abstract The occurrence of the severe slugging phenomenon in multiphase pipelines can cause serious and troublesome operational problems within the receiving process facilities. This paper describes: the pipeline operability studies on the Dunbar to Always multiphase pipeline regarding riser-induced severe slugging; the control scheme selected to prevent this phenomenon; and the subsequent operating experience. The pipeline operability studies involving dynamic simulations concluded that riser-induced severe slugging could occur over a wide range of production rates, in particular when the ElIon gas is unavailable. The challenge for TOTAL was to develop an operating strategy and a control scheme in order to eliminate severe slugging and operate the pipeline without significant process upset. An automatic control scheme was selected which offered a cost effective solution and ensured the safety of the existing process installations. Its originality was that it was based on a Riser Base Pressure Control. Since the initial start-up in December 1994, this selected scheme has proven to be successful and has enabled the pipeline operations in the riser-induced severe slugging region to be carried out without any difficulty. Introduction The Dunbar field is situated in the UK sector of the northern North Sea, approximately 22 km to the South of Alwyn North field which has been operated since the end of 1987 (Fig. 1 and Fig. 2). The recent development of the Dunbar field and its satellite ElIon comprises a production platform linked to the Alwyn North platform by a 16' multiphase pipeline (Fig. 3). The gas from El- Ion (Subsea wells) and the oil and gas from Dunbar are co-mingled and the overall well-fluid production is routed without separation to the Alwyn North processing and treatment facilities. The Dunbar 16' Multiphase Pipeline has been designed to export the Dunbar and Ellen production to Alwyn North (NAB platform) at a maximum flow of 49000 BOPD and 7.9 MMSCMD. Over a wide range of production rates, in particular when the ElIon gas is unavailable, the pipeline operation is in an unstable region where riser- induced severe occurs. The purpose of this document is :. to give a short description of the flow regimes predicted in the DUNBAR 16' Multiphase Pipeline and in particular of the severe slugging phenomenon.to present the operating strategy and the control system developed by TOTAL in order to prevent severe slugging and to operate the pipeline without occurrence of significant process upsets.and to give a feed-back of the pipeline operation at low flow rates 1. Flow regimes and severe slugging The pipeline profile of the Dunbar 16' pipeline is represented in Fig. 4. The flow regime map for this pipeline operated at a NAB riser-base pressure of 74 is given in Fig. 5 This map was based on the results of dynamic simulations performed with the OLGA pipeline software.

Publisher

OTC

Cited by 13 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3