Best Practices in Well Construction - The Journey to One Billion Barrels Oil Production in Bonga Field

Author:

Ojeh-Oziegbe O.1,Okosun A.1,Justus N.1,Ezenwanne E.1,Aribike O.1,Adubi O.1

Affiliation:

1. Shell Nigeria Exploration and Production Company, Lagos State, Nigeria

Abstract

Abstract In the fiercely competitive realm of brownfield oil and gas projects, our well construction team embarked on a transformative journey marked by unparalleled achievements, as outlined in this paper. This abstract sheds light on the strategic fusion of cutting-edge technologies, innovative processes, and the skill and expertise of the well construction team, which drove the remarkable recovery of over one billion barrels of oil in the illustrious Bonga Field. Navigating the intricate challenges inherent in brownfield environments, our team pursued a dual path of technological innovation and operational process optimization. The tangible outcome was a comprehensive suite of groundbreaking drilling and completion advancements that accelerated project timelines, brought wells online sooner, and substantially reduced well capital and operational expenditure. The achievements are multifaceted, encompassing the adoption of pioneering drilling technologies for extended horizontal reach wells and real-time wellbore visualization using lookahead tools, particularly in geo-steering within thin-bedded sands. Advanced wellbore placement, trajectory control, and drill string optimization significantly elevated flow rates and rates of penetration (ROP), accompanied by improved cuttings cleanup. A strategic paradigm shift involved using offset well data for risk assessment and well planning, eliminating the need for redundant activities in every well based on available offset well data. Operations were streamlined by integrating various tasks into single runs, showcasing unprecedented efficiency gains. Crucially, our focus transcended hardware enhancements to embrace strategic procedural improvements, with proficient drilling supervisors wielding optimized Bottom Hole Assembly (BHA) configurations to push operational boundaries and enhance ROP, ensuring wellbore integrity. The culmination of these achievements propelled the Bonga project well beyond its production target, recovering over one billion barrels of oil. This abstract immerses the reader in the strategic orchestration of technologies, procedural enhancements, and the exceptional prowess of our team, offering profound insights into the dynamic interplay between human expertise and cutting-edge solutions in the realm of well construction. It is a testament to the extraordinary accomplishments defining our journey to surpassing one billion barrels in the Bonga Field.

Publisher

OTC

Reference23 articles.

1. Implementation of Rig Simultaneous Operations Over Drill Centers to Improve Deepwater Drilling Performance;Abuah,2020

2. Shell Nigeria Exploration and Production Company Ltd; Bonga North Story: Beyond 1 Billion Barrels – Driving Growth with subsea Tiebacks in Deepwater Nigeria;Adegoke,2024

3. PETRONAS Cargali sdn; Nor Sharifah Omar, Diana Madi and Nurlyiana Ridzuan Radin;Hareezi,2015

4. Shell Nigeria Exploration and Production Company Limited;Okosun;Production Optimization in Bonga Deepwater Through Rigless Intervention,2024

5. Cost Effective, Reduced Trip Completions?;Robertson;Problem Solved,2019

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3