ANALYSIS OF CONSTRUCTION PRODUCTIVITY BASED ON CONSTRUCTION DURATION PER FLOOR AND PER GROSS AREA, WITH IDENTIFICATION OF INFLUENTIAL FACTORS

Author:

Lee Chijoo1,Won Jongsung2

Affiliation:

1. Construction Economy and Industry Research Division, Korea Research Institute for Human Settlements, Sejong-si 30147, South Korea

2. School of Architecture, Korea National University of Transportation, Chungju, Chungcheongbuk-do 27469, South Korea

Abstract

This study analyzes construction productivity based on the construction duration per floor and per gross area over 20 years (1996–2015) and compares the results among the United States, United Kingdom, South Korea, and Japan, which have similar sizes of total construction investment and market risk. Although construction labor productivity is widely used to analyze and compare construction productivity among countries, it does not consider the changed construction duration caused by levels of investment and technology. Therefore, construction duration per floor and gross area was selected analyze and compare construction productivity in this paper. Regular and non-modular buildings with a total of five or more floors and a basement are collected during the analysis period (1996–2015). The total number of collected buildings is 800 and it includes buildings in the United States (194), the United Kingdom (186), South Korea (322) and Japan (98). Construction duration, increase rate and standard deviation are then compared between each country. Finally, factors that influence construction duration are derived and additionally considered to explain and adjust the trends and changes of construction productivity related to construction duration in the four countries. The productivity of the United States is the highest, but the difference between it and other countries decreases steadily because the increase rate of the construction duration in the United stated is larger than those of other countries. Then, the factors influencing the construction duration are derived as a learning effect by the number of ground floors and gross area, as well as the rate of constructed buildings with a first basement floor for efficient productivity management. The rate of the first basement floor influences both the construction duration per floor and per gross area. This study contributes to the field by explaining the productivity change based on the construction duration and proposing the key management point of the productivity by deriving the influence factors

Publisher

Vilnius Gediminas Technical University

Subject

Strategy and Management,Civil and Structural Engineering

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3